আজকের নির্ধারিত কার্য তালিকা (2025-12-09)
Serial No: 1 || WID:WID2220 || Status:
|| Scheduled at: 2025-12-07
Irp2 Sand Filter Bed G MOV-3V07 Percentage Problem. Need to check
Deployed Manpower:
History/Log:
Serial No: 2 || WID:WID2219 || Status:
|| Scheduled at: 2025-12-01
IRP-01 to IRP-02 Optical fiber communication problem. We can not control IRP-02 From IRP-01. Need to check.
Deployed Manpower:
History/Log:
Serial No: 3 || WID:WID2218 || Status:
|| Scheduled at: 2025-12-01
irp-2 Sand Filter 'E' MOV3V07 is fully(100%) opened during low back wash.According to the sequence, it was supposed to open 18%.
Deployed Manpower:
History/Log:
Serial No: 4 || WID:WID2217 || Status:
|| Scheduled at: 2025-11-29
Serial No: 5 || WID:WID2216 || Status:
|| Scheduled at: 2025-11-29
Serial No: 6 || WID:WID2215 || Status:
|| Scheduled at: 2025-11-29
Serial No: 7 || WID:WID2214 || Status:
|| Scheduled at: 2025-11-29
Serial No: 8 || WID:WID2213 || Status:
|| Scheduled at: 2025-11-29
Serial No: 9 || WID:WID2212 || Status:
|| Scheduled at: 2025-11-29
Serial No: 10 || WID:WID2211 || Status:
|| Scheduled at: 2025-11-29
Serial No: 11 || WID:WID2210 || Status:
|| Scheduled at: 2025-11-29
Serial No: 12 || WID:WID2209 || Status:
|| Scheduled at: 2025-11-29
Serial No: 13 || WID:WID2208 || Status:
|| Scheduled at: 2025-11-29
Serial No: 14 || WID:WID2207 || Status:
|| Scheduled at: 2025-11-29
Serial No: 15 || WID:WID2206 || Status:
|| Scheduled at: 2025-11-29
Serial No: 16 || WID:WID2205 || Status:
|| Scheduled at: 2025-11-29
Serial No: 17 || WID:WID2204 || Status:
|| Scheduled at: 2025-11-29
Serial No: 18 || WID:WID2203 || Status:
|| Scheduled at: 2025-11-29
Serial No: 19 || WID:WID2201 || Status:
|| Scheduled at: 2025-11-25
IRP-01 Sand filter-A MOV-2V05A Preventive maintenance work.
Deployed Manpower:
History/Log:
Serial No: 20 || WID:WID2200 || Status:
|| Scheduled at: 2025-11-25
Serial No: 21 || WID:WID2197 || Status:
|| Scheduled at: 2025-11-25
IRP-01 Sand filter-I MOV-2V05I Automatically Auto to man mode change. Need to check.
Deployed Manpower:
History/Log:
Serial No: 22 || WID:WID2196 || Status:
|| Scheduled at: 2025-11-25
The MOV(Motorized Operated Valve) has suddenly closed. The SCADA system is indicating a fault. However, upon field inspection, the valve is confirmed to be in the closed position and no local fault is indicated at the field.
Deployed Manpower:
History/Log:
Serial No: 23 || WID:WID2181 || Status:
|| Scheduled at: 2025-11-22
Serial No: 24 || WID:WID2179 || Status:
|| Scheduled at: 2025-11-22
DTW-123 VFD, RTU and CCTV Camera Panel Cleaning Work.
Deployed Manpower:
History/Log:
Serial No: 25 || WID:WID2178 || Status:
|| Scheduled at: 2025-11-22
DTW-122 VFD, RTU and CCTV Camera Panel Cleaning Work.
Deployed Manpower:
History/Log:
Serial No: 26 || WID:WID2177 || Status:
|| Scheduled at: 2025-11-22
DTW-121 VFD,RTU and CCTV Camera Panel Cleaning Work.
Deployed Manpower:
History/Log:
Serial No: 27 || WID:WID2176 || Status:
|| Scheduled at: 2025-11-22
DTW-120 VFD,RTU and CCTV Camera Panel Cleaning Work.
Deployed Manpower:
History/Log:
Serial No: 28 || WID:WID2174 || Status:
|| Scheduled at: 2025-11-19
Serial No: 29 || WID:WID2173 || Status:
|| Scheduled at: 2025-11-19
DTW 201 to 209 CCTV view not showing. Need to check Fiber optic cable
Deployed Manpower:
History/Log:
Serial No: 30 || WID:WID2166 || Status:
|| Scheduled at: 2025-11-18
Serial No: 31 || WID:WID2156 || Status:
|| Scheduled at: 2025-11-12
Configuration & commissioning of surveillance camera for the DTW (Help to the contract #Tech Zone)
Deployed Manpower:
History/Log:
Serial No: 32 || WID:WID2155 || Status:
|| Scheduled at: 2025-11-12
Serial No: 33 || WID:WID2154 || Status:
|| Scheduled at: 2025-11-11
DTW-118 VFD Output phase loss showing. Need to check.
Deployed Manpower:
History/Log:
Serial No: 34 || WID:WID2152 || Status:
|| Scheduled at: 2025-11-10
Serial No: 35 || WID:WID2151 || Status:
|| Scheduled at: 2025-11-10
Configuration & commissioning of surveillance camera for the DTW (Help to the contract # power Electric Engineering)
Deployed Manpower:
History/Log:
Serial No: 36 || WID:WID2149 || Status:
|| Scheduled at: 2025-11-05
IRP-01 SLUDGE DRYING BED PUMP NOT RUN. NEED TO CHECK ICE TEAM.
Deployed Manpower:
History/Log:
Serial No: 37 || WID:WID2147 || Status:
|| Scheduled at: 2025-11-04
Fiber integration for the SCADA network at dtw-114
Deployed Manpower:
History/Log:
Serial No: 38 || WID:WID2146 || Status:
|| Scheduled at: 2025-11-04
Serial No: 39 || WID:WID2145 || Status:
|| Scheduled at: 2025-11-04
Serial No: 40 || WID:WID2144 || Status:
|| Scheduled at: 2025-11-04
Serial No: 41 || WID:WID2142 || Status:
|| Scheduled at: 2025-11-03
DTW-112 UVR Maintenance.
Deployed Manpower:
History/Log:
01st December 2025, 8:28am: জমাকৃত মালামালের তালিকাঃ Digital Multi-function Relay (UVR)- 01 SetDTW-112 UVR Replacement Work_
Kazi Jewel_Helper.
Work ID: 2142,
Serial Number: EC171602017.05. -By: Md. Amzad Hossen
Serial No: 42 || WID:WID2129 || Status:
|| Scheduled at: 2025-10-15
Chlorine neutralization system NaOH pump A & B stop after two or three minutes of running. Need to check...
Deployed Manpower:
History/Log:
Serial No: 43 || WID:WID2049 || Status:
|| Scheduled at: 2025-09-28
Serial No: 44 || WID:WID2026 || Status:
|| Scheduled at: 2025-09-24
Irp2 Backwash Tank A Remote to Auto Command can't accept. Need to check
Deployed Manpower:
History/Log:
Serial No: 45 || WID:WID2009 || Status:
|| Scheduled at: 2025-09-23
DTW 208 radio antenna re-adjustment and maintenance for proper communication with scada
Deployed Manpower:
History/Log:
Serial No: 46 || WID:WID2008 || Status:
|| Scheduled at: 2025-09-23
DTW 207 radio antenna re-adjustment and maintenance for proper communication with scada
Deployed Manpower:
History/Log:
Serial No: 47 || WID:WID2007 || Status:
|| Scheduled at: 2025-09-23
DTW 206 radio antenna re-adjustment and maintenance for proper communication with scada
Deployed Manpower:
History/Log:
Serial No: 48 || WID:WID2006 || Status:
|| Scheduled at: 2025-09-23
DTW 205 radio antenna re-adjustment and maintenance for proper communication with scada
Deployed Manpower:
History/Log:
Serial No: 49 || WID:WID2005 || Status:
|| Scheduled at: 2025-09-23
DTW 204 radio antenna re-adjustment and maintenance for proper communication with scada
Deployed Manpower:
History/Log:
Serial No: 50 || WID:WID2004 || Status:
|| Scheduled at: 2025-09-23
DTW 203 radio antenna re-adjustment and maintenance for proper communication with scada
Deployed Manpower:
History/Log:
Serial No: 51 || WID:WID2002 || Status:
|| Scheduled at: 2025-09-23
DTW 201 radio antenna re-adjustment and maintenance for proper communication with scada
Deployed Manpower:
History/Log:
Serial No: 52 || WID:WID1990 || Status:
|| Scheduled at: 2025-09-23
DTW 112 radio antenna re-adjustment and maintenance for proper communication with scada
Deployed Manpower:
History/Log:
Serial No: 53 || WID:WID1970 || Status:
|| Scheduled at: 2025-09-14
Creating a series line to test electrical equipment.
Deployed Manpower:
History/Log:
Serial No: 54 || WID:WID1954 || Status:
|| Scheduled at: 2025-09-07
DTW- 214, Radio communication error. Need to check.
Deployed Manpower:
History/Log:
Serial No: 55 || WID:WID1917 || Status:
|| Scheduled at: 2025-08-30
DTW-207 Start/ stop problem. It could be serial communication problem. Need to check.
Deployed Manpower:
History/Log:
Serial No: 56 || WID:WID1914 || Status:
|| Scheduled at: 2025-08-28
DTW-202 UPS FAULT SHOWING IN SCADA. NEED TO CHECK ICE TEAM.
Deployed Manpower:
History/Log:
29th September 2025, 3:17pm: প্রদানকৃত মালামালের তালিকাঃ 01. MAGNETIC CONTRACTOR (MC) OF 125A, 3P= 01 (One) Set02. Relay= 01 (one) Nos.
03. Relay Base= 01 (One) Nos. -By: Md. Amzad Hossen
Serial No: 57 || WID:WID1913 || Status:
|| Scheduled at: 2025-08-28
DTW-201 UPS FAULT SHOWING IN SCADA. NEED TO CHECK ICE TEAM.
Deployed Manpower:
History/Log:
Serial No: 58 || WID:WID1910 || Status:
|| Scheduled at: 2025-08-28
DTW-117 UPS FAULT SHOWING IN SCADA. NEED TO CHECK ICE TEAM.
Deployed Manpower:
History/Log:
Serial No: 59 || WID:WID1900 || Status:
|| Scheduled at: 2025-08-23
Dtw- 118 Radio Communication Error. Need to check. It is a Bridge point with Dtw 122. Now the pump is locally Running.
Deployed Manpower:
History/Log:
Serial No: 60 || WID:WID1887 || Status:
|| Scheduled at: 2025-08-12
Serial No: 61 || WID:WID1886 || Status:
|| Scheduled at: 2025-08-11
DTW 104 ups fault (dry contact)coming.
Deployed Manpower:
History/Log:
27th September 2025, 2:31pm: পাম্পে কাজের জন্য প্লান্ট থেকে বাহির হয়েছে।02:28pm -By: Rubel Ahmed27th September 2025, 2:38pm: পাম্পে কাজের জন্য প্রবেশ করেছেন।02:38pm -By: Rubel Ahmed
27th September 2025, 3:23pm: পাম্পের কাজ শেষ করে বাহির হয়েছে।03:22pm -By: Rubel Ahmed
27th September 2025, 3:35pm: কাজ শেষ করে প্লান্টে প্রবেশ করেছেন।03:34pm -By: Rubel Ahmed
Serial No: 62 || WID:WID1885 || Status:
|| Scheduled at: 2025-08-11
Serial No: 63 || WID:WID1884 || Status:
|| Scheduled at: 2025-08-11
Serial No: 64 || WID:WID1883 || Status:
|| Scheduled at: 2025-08-11
DTW 120 UPS fault (ups dry contact)coming.need to check
Deployed Manpower:
History/Log:
Serial No: 65 || WID:WID1881 || Status:
|| Scheduled at: 2025-08-10
Data recovery with OS setup for nadim PC
Deployed Manpower:
History/Log:
Serial No: 66 || WID:WID1879 || Status:
|| Scheduled at: 2025-08-06
Dtw 204 PLC serial communication wiring maintenance & redraw for the future maintenance.
Deployed Manpower:
History/Log:
Serial No: 67 || WID:WID1876 || Status:
|| Scheduled at: 2025-03-08
Serial No: 68 || WID:WID1856 || Status:
|| Scheduled at: 2025-07-29
Serial No: 69 || WID:WID1854 || Status:
|| Scheduled at: 2025-07-28
DTW-113 AUTO RUN COMMAND NOT ACCEPTING. NEED TO CHECK ICE TEAM.
Deployed Manpower:
History/Log:
Serial No: 70 || WID:WID1853 || Status:
|| Scheduled at: 2025-07-28
DTW-123 RADIO COMMUNICATION ERROR. NEED TO CHECK ICE TEAM.
Deployed Manpower:
History/Log:
Serial No: 71 || WID:WID1816 || Status:
|| Scheduled at: 2025-06-16
Irp2 Backwash Tank A From Remote To Auto Can't Operate. Need to check
Deployed Manpower:
History/Log:
17th August 2025, 4:53pm: জমাকৃত মালামালের তালিকাঃ 01. RADIO MODEM= 01 (One) SetCondition: Good
Serial: 412865 -By: Md. Amzad Hossen
18th August 2025, 9:19am: জমাকৃত মালামালের তালিকাঃ SURGE PROTECTOR ANTENNA CABLE-RADIO MODEM= 01 (One) Set
Items: 02-09-15-2192
Note: Signal Power না পাওয়ায় উক্ত ডিভাইসটি পরিবর্তন করা হয়েছে। -By: Md. Amzad Hossen
18th August 2025, 9:24am: জমাকৃত মালামালের তালিকাঃ Antenna Special Cable
Note: Communication না পাওয়ায় উক্ত ডিভাইসটি পরিবর্তন করা হয়েছে। -By: Md. Amzad Hossen
18th September 2025, 11:42am: কাজের জন্য প্রবেশ করেছেন।11:30am -By: Rubel Ahmed
18th September 2025, 11:56am: কাজ শেষ করে বাহির হয়েছে।11:55am -By: Rubel Ahmed
18th September 2025, 12:07pm: কাজ শেষ করে প্লান্টে প্রবেশ করেছেন।12:05pm -By: Rubel Ahmed
Serial No: 72 || WID:WID1772 || Status:
|| Scheduled at: 2025-05-17
DTW-220 turns off automatically after running. It was also started in local mode, but stopped again after some time. Right now, the pump is not running. Need to emergency check...
Deployed Manpower:
History/Log:
24th May 2025, 11:38am: IRP - 01 PLANT OUT TIME 09:06 AND DTW NO 220 IN TIME 09:26 -By: Khokon Roy24th May 2025, 11:47am: DTW NO 220 OUT TIME 11:13 -By: Khokon Roy
24th May 2025, 12:07pm: নতুন একটি VFD CONTROLLER সহ ফুলসে ইনস্টল করা হয়েছে এবং পুরাতন টি স্টোরে জমা দেওয়ার জন্য অফিসে নিয়ে আসা হয়েছে । -By: Kazi Jewal
24th May 2025, 12:14pm: IRP - 01 PLANT IN TIME 11:29 -By: Khokon Roy
26th May 2025, 4:27pm: নতুন একটি VFD ইনস্টল করা হয়েছে বর্তমানে পাম কি স্বাভাবিক অবস্থায় আছে এবং রিমোটে পরিচালনা করা যাচ্ছে । -By: Kazi Jewal
20th August 2025, 9:26am: প্রদানকৃত মালামালের তালিকাঃ 01. VARIABLE FREQUENCY DRIVE (VFD) 55KW= 01 set
Including VFD controller with display
Serial Number: 4005400JM222101689
Brand: Schanider, Model: ATV630D55N4 -By: Md. Amzad Hossen
20th August 2025, 9:26am: প্রদানকৃত মালামালের তালিকাঃ Manual Issue Slip No. 173, Book No. 04,
date: 22.05.2025 -By: Md. Amzad Hossen
20th August 2025, 9:29am: জমাকৃত মালামালের তালিকাঃ 01. VARIABLE FREQUENCY DRIVE (VFD) 55KW= 01 set
Including VFD controller with display
Serial Number: 4005400JM171100656
Brand: Schanider, Model: ATV630D55N4
Note: Input Thyristor Fault (IPL)_Mehadi Hasan_Ayesha Enterprise_ dt. 18.08.2025 -By: Md. Amzad Hossen
20th August 2025, 9:30am: জমাকৃত মালামালের তালিকাঃ জমাকৃত VFD টি সার্ভিসিং করার জন্য উদ্ধর্তন কর্তৃপক্ষের অনুমোদন সাপেক্ষে আয়শা এন্টার প্রাইজকে দেওয়া হল।
যাহার Manual Gate Pass No. 3322, dt. 18.08.2025, -By: Md. Amzad Hossen
Serial No: 73 || WID:WID1722 || Status:
Ongoing || Scheduled at: 2025-04-23
Plant inside CCTV view not showing.Need to check...
Deployed Manpower:
History/Log:
28th September 2025, 10:46am: কাজ করা হয়েছে বেশির ভাগ ক্যামেরাই সমস্যার সমাধান হয়ে গেছে। -By: Kazi Jewal
Serial No: 74 || WID:WID1720 || Status:
|| Scheduled at: 2025-04-19
Dtw 209 communication error.now it's locally running.need to check
Deployed Manpower:
History/Log:
Serial No: 75 || WID:WID1703 || Status:
|| Scheduled at: 2025-04-11
IRP-02 SCADA View -X log in password দিলে নিচ্ছে না।
Deployed Manpower:
History/Log:
Serial No: 76 || WID:WID1701 || Status:
|| Scheduled at: 2025-04-12
Irp-1 sand filter 'L' LIT-2003L real value not showing.need to check
Deployed Manpower:
History/Log:
Serial No: 77 || WID:WID1700 || Status:
|| Scheduled at: 2025-04-10
Serial No: 78 || WID:WID1699 || Status:
|| Scheduled at: 2025-04-10
Serial No: 79 || WID:WID1698 || Status:
|| Scheduled at: 2025-04-10
Serial No: 80 || WID:WID1669 || Status:
|| Scheduled at: 2025-04-07
SCADA operation reporting PC excel not working. Need to check...
Deployed Manpower:
History/Log:
06th April 2025, 11:21am: SCADA operation reporting PC excel not working. Need to check... ???? Writing Mistake Request to correction???? -By: Md. Khairul Momen
Serial No: 81 || WID:WID1662 || Status:
|| Scheduled at: 2025-03-20
When the delivery pump A(Alpha) is running, the pump + MOV runs together. Need to check.
Deployed Manpower:
History/Log:
Serial No: 82 || WID:WID1660 || Status:
|| Scheduled at: 2025-03-19
Irp-2 sand filter area FCB panel exhaust fan need to check
Deployed Manpower:
History/Log:
Serial No: 83 || WID:WID1638 || Status:
Ongoing || Scheduled at: 2025-03-15
DTW-122, Camera No. 185, View not showing in monitor. Need to check.
Deployed Manpower:
History/Log:
05th April 2025, 11:01am: IRP-01 PLANT OUT TIME 10:44 -By: Khokon Roy05th April 2025, 11:24am: ক্যামেরার কেবল কাটা আছে যার কারণে খুলে অফিসে ঠিক করার উদ্দেশ্যে নিয়ে যাওয়া হলো -By: Kazi Jewal
05th April 2025, 12:03pm: DTW NO 122 IN TIME 10:56 AND OUT TIME 11:17 -By: Khokon Roy
05th April 2025, 12:31pm: IRP-01 PLANT IN TIME 12:15 -By: Khokon Roy
Serial No: 84 || WID:WID1627 || Status:
|| Scheduled at: 2025-03-12
DTW-112 VFD HMI display value not showing. Need to check....
Deployed Manpower:
History/Log:
Serial No: 85 || WID:WID1619 || Status:
|| Scheduled at: 2025-03-09
Irp2 Backwash Holding Tank A Automatically From REM To LOCAL Mood is showing. Need to check.
Deployed Manpower:
History/Log:
15th May 2025, 10:31am: প্রদানকৃত মালামালের তালিকাঃ 01. MAGNETIC CONTRACTOR (MC) OF 125A, 3P= 01 Set-By: Md. Amzad Hossen
15th May 2025, 10:32am: প্রদানকৃত মালামালের তালিকাঃ 01. MAGNETIC CONTRACTOR (MC) OF 125A, 3P= 01 Set
এন্ট্রি ভুল ছিল। ওয়ার্ক আইডি হবে- ১৭৬৫ -By: Md. Amzad Hossen
Serial No: 86 || WID:WID1615 || Status:
|| Scheduled at: 2025-03-05
Serial No: 87 || WID:WID1614 || Status:
|| Scheduled at: 2025-03-05
Dtw 219 communication error.
Deployed Manpower:
History/Log:
06th March 2025, 11:39am: পাম্পে কাজের জন্য প্লান্ট থেকে বাহির হয়েছে।11:29am -By: Rubel Ahmed06th March 2025, 11:59am: পাম্পে কাজের জন্য প্রবেশ করেছেন।11:50am -By: Rubel Ahmed
06th March 2025, 1:14pm: পাম্পের কাজ শেষ করে বাহির হয়েছে।01:05pm -By: Rubel Ahmed
06th March 2025, 2:14pm: কাজ শেষ করে প্লান্টে প্রবেশ করেছেন।02:06pm -By: Rubel Ahmed
Serial No: 88 || WID:WID1613 || Status:
|| Scheduled at: 2025-03-01
Serial No: 89 || WID:WID1605 || Status:
Ongoing || Scheduled at: 2025-02-26
DTW-203 লোকাল/রিমোট কোন মোডেই run হচ্ছে না। Need to check.
Deployed Manpower:
History/Log:
27th February 2025, 3:14pm: কাজ করা হয়েছে বর্তমানে রান অবস্থায় পাম রানিং অবস্থায় আছে -By: Kazi Jewal04th March 2025, 12:26pm: পাম্পে কাজের জন্য প্লান্ট থেকে বাহির হয়েছে।12:17pm -By: Rubel Ahmed
04th March 2025, 12:55pm: পাম্পে কাজের জন্য প্রবেশ করেছেন।12:46pm -By: Rubel Ahmed
04th March 2025, 2:39pm: প্রদানকৃত মালামালের তালিকাঃ 01. VFD Main Control Module (VFD controller with display)= 01 Set
VFD controller Serial: 641922004190 EAV75036A02, Display: WXHRB67835211870011
Brand: Schneider, Origin: France.
Items Code: 02-25-01-0003 -By: Md. Amzad Hossen
04th March 2025, 3:39pm: পাম্পের কাজ শেষ করে বাহির হয়েছে।03:29pm -By: Rubel Ahmed
04th March 2025, 4:10pm: কাজ শেষ করে প্লান্টে প্রবেশ করেছেন।03:57pm -By: Rubel Ahmed
04th March 2025, 4:38pm: VFD controller fault found. After the change of controller, the VFD now run smoothly.
Another issue here "Modbus interrupt". So, we decide to change the modbus cable from RTU to GiMAC in the next working day.
Kazi Jewel is instructed to change the cable -By: Field Observer
06th March 2025, 2:18pm: জমাকৃত মালামালের তালিকাঃ গিয়াস উদ্দিন সাহেব উক্ত কাজের আপটেড ও পুরাতন মালামাল জমা প্রদান করুন।
-By: Md. Amzad Hossen
Serial No: 90 || WID:WID1604 || Status:
Ongoing || Scheduled at: 2025-02-26
DTW-203 Communication feedback very very slow. Need to check.
Deployed Manpower:
History/Log:
27th February 2025, 3:16pm: পাম নাম্বার 205 এর কারণে কমিউনিকেশনের সমস্যা হচ্ছে ২০৫ চেক করতে হবে আগে -By: Kazi Jewal
Serial No: 91 || WID:WID1601 || Status:
Ongoing || Scheduled at: 2025-02-22
DTW-208 Communication feedback very slow. Need to check.
Deployed Manpower:
History/Log:
27th February 2025, 3:17pm: পামতাম বা ২০৫ এর কারণে কমিউনিকেশন পাওয়া যাচ্ছে না আগে ২০৫ এর কাজ করতে হবে -By: Kazi Jewal27th February 2025, 3:27pm: পাম্প নাম্বার ২০৫ এর কারণে কমিউনিকেশন পাওয়া যাচ্ছে না আগে ২০৫ এর কাজ করতে হবে
-By: Kazi Jewal
11th March 2025, 12:15pm: মেরামত করার জন্য স্টোরে জমা দেওয়া হল ।
সাত(৭) কর্ম দিবসের মধ্যে আমাদেরকে এই সম্পর্কিত আপডেট জানানোর জন্য অনুরোধ করা হলো ।
মেরামত সংক্রান্ত আপডেট জানানোর পর ওয়ার্ক অর্ডারটির স্ট্যাটাস পরিবর্তন করা হবে । -By: Kazi Jewal
Serial No: 92 || WID:WID1600 || Status:
Ongoing || Scheduled at: 2025-02-20
DTW-204 Communication feedback very slow. Need to check.
Deployed Manpower:
History/Log:
27th February 2025, 3:19pm: পাম্প নাম্বার ২০৫ এর কারণে কমিউনিকেশন পাওয়া যাচ্ছে না আগে ২০৫ এর কাজ করতে হবে -By: Kazi Jewal
Serial No: 93 || WID:WID1599 || Status:
|| Scheduled at: 2025-02-19
DTW-222 Communication feedback very slow. Need to check.
Deployed Manpower:
History/Log:
Serial No: 94 || WID:WID1598 || Status:
Ongoing || Scheduled at: 2025-02-20
DTW-G-Mac value not showing. Need to check...
Deployed Manpower:
History/Log:
27th February 2025, 3:21pm: এটা কত নাম্বার পাম্পের সমস্যা না বুঝতে পারার কারণে আমরা কাজে করতে পারিনি -By: Kazi Jewal28th February 2025, 2:11am: DTW-115 -By: Md. Khairul Momen
Serial No: 95 || WID:WID1597 || Status:
Ongoing || Scheduled at: 2025-02-20
DTW-121 Communication problem. Pump locally running.. Need to check...
Deployed Manpower:
History/Log:
27th February 2025, 3:22pm: Skoda প্যাক না থাকার কারণে এখানে কমিউনিকেশন নেই -By: Kazi Jewal
Serial No: 96 || WID:WID1596 || Status:
Ongoing || Scheduled at: 2025-02-20
DTW-123 Communication feedback very slow. Need to check.
Deployed Manpower:
History/Log:
01st March 2025, 10:18am: পাম্পে কাজের জন্য প্রবেশ করেছেন।10:07am -By: Rubel Ahmed01st March 2025, 10:30am: পাম্পের কাজ শেষ করে বাহির হয়েছে।10:18am -By: Rubel Ahmed
01st March 2025, 10:52am: DTW-123 Communication চেক করা হয়েছে এখানে রেঞ্জ অনেক কম দেখাচ্ছে বড় লিডার এনে এন্টেনা পজিশন সেট করতে হবে -By: Kazi Jewal
01st March 2025, 11:05am: কাজ শেষ করে প্লান্টে প্রবেশ করেছেন।10:57am -By: Rubel Ahmed
Serial No: 97 || WID:WID1595 || Status:
Ongoing || Scheduled at: 2025-02-19
DTW-119 Communication feedback very slow. Need to check.
Deployed Manpower:
History/Log:
27th February 2025, 12:21pm: DTW119Radio communication check. Radio DC voltage did not response. That's why we can't adjust. -By: Kazi Jewal
27th February 2025, 9:58pm: IRP-01 PLANT OUT TIME 11:18 AND DTW NO 119 IN TIME 11:55 OUT TIME 12:14 . IRP-01 PLANT IN TIME 13:17 -By: Khokon Roy
Serial No: 98 || WID:WID1594 || Status:
Ongoing || Scheduled at: 2025-02-19
DTW-120 Communication feedback very slow. Need to check.
Deployed Manpower:
History/Log:
01st March 2025, 9:35am: পাম্পে কাজের জন্য প্লান্ট থেকে বাহির হয়েছে।09:26am -By: Rubel Ahmed01st March 2025, 9:44am: পাম্পে কাজের জন্য প্রবেশ করেছেন।09:37am -By: Rubel Ahmed
01st March 2025, 10:08am: পাম্পের কাজ শেষ করে বাহির হয়েছে।09:53am -By: Rubel Ahmed
01st March 2025, 10:53am: DTW-120 Communication চেক করা হয়েছে এখানে রেস থ্রি পয়েন্ট এর উপরে দেখাচ্ছে অনেক ভালো পজিশনে আছে -By: Kazi Jewal
Serial No: 99 || WID:WID1593 || Status:
Ongoing || Scheduled at: 2025-02-19
DTW-115 LIT Problem. Need to check.
Deployed Manpower:
History/Log:
27th February 2025, 3:25pm: পাম্প নাম্বার ১১৫ LIT চেক করা হয়েছে এখানে LIT তে সমস্যা পাওয়া গেছে -By: Kazi Jewal
Serial No: 100 || WID:WID1589 || Status:
|| Scheduled at: 2025-02-19
Dtw 117 local network EPRV (MOV) not controlling by scada
Deployed Manpower:
History/Log:
Serial No: 101 || WID:WID1588 || Status:
Ongoing || Scheduled at: 2025-02-19
Dtw 114 communication error.need to check
Deployed Manpower:
History/Log:
24th February 2025, 10:39am: SCADAPACK installed and reconfigure the radio modem yesterday. Now the communication is okay. But still there is some issue1. Pump can't run from scada -By: Field Observer
Serial No: 102 || WID:WID1586 || Status:
|| Scheduled at: 2025-02-18
Serial No: 103 || WID:WID1584 || Status:
Ongoing || Scheduled at: 2025-02-18
Dtw 103 suddenly vfd fault coming .
Deployed Manpower:
History/Log:
20th February 2025, 1:38pm: DTW-103 remotely run করলে হঠাৎ বন্ধ হয়ে যায় । VFD ফল্ট দেখায়, মটবাস কমিউনিকেশন এরর দেখায়। পাম্প লোকালয় করে রান করলে সমস্যা হয় না। বর্তমানে পাম্পটি পরীক্ষামূলক ভাবে remotely run আছে। দ্রুত ব্যবস্থা নেয়া প্রয়োজন। -By: Md. Khairul Momen24th February 2025, 11:34am: IRP-01 PLANT OUT TIME 11:24 -By: Khokon Roy
24th February 2025, 12:06pm: Dtw 103 suddenly vfd fault coming করা হয়েছে এইটার টাইম ঠিক ছিল না যার কারণে অনেক আগের সমস্যা দেখাচ্ছে বর্তমানে টাইম ঠিক করে দেয়া হয়েছে এখন আবার সমস্যা হলে এসে চেক করে দেখা যাবে -By: Kazi Jewal
24th February 2025, 12:10pm: DTW NO 103 IN TIME 11:49 AND OUT TIME 11:55 -By: Khokon Roy
11th March 2025, 12:05pm: মেরামত করার জন্য স্টোরে জমা দেওয়া হল ।
সাত(৭) কর্ম দিবসের মধ্যে আমাদেরকে এই সম্পর্কিত আপডেট জানানোর জন্য অনুরোধ করা হলো ।
মেরামত সংক্রান্ত আপডেট জানানোর পর ওয়ার্ক অর্ডারটির স্ট্যাটাস পরিবর্তন করা হবে । -By: Kazi Jewal
Serial No: 104 || WID:WID1582 || Status:
|| Scheduled at: 2025-02-17
Dtw 106 communication error. Locally running. Need to check
Deployed Manpower:
History/Log:
Serial No: 105 || WID:WID1579 || Status:
Ongoing || Scheduled at: 2025-02-11
Dtw 116 scada system have been stuck need to check
Deployed Manpower:
History/Log:
16th February 2025, 10:58am: VFD Controller changed at 13.02.2025, Newly procured VFD controller is not compatible with the VFD. -By: SCADA OPERATION ENGR16th February 2025, 4:37pm: ১১৬ নং পাম্পে কাজের জন্য প্লান্ট থেকে বাহির হয়েছে।০৪:২৭pm -By: Rubel Ahmed
16th February 2025, 4:49pm: ১১৬ নং পাম্পে কাজের জন্য প্রবেশ করেছেন।০৪:৩৬pm -By: Rubel Ahmed
16th February 2025, 6:49pm: ১১৬ নং পাম্পের কাজ শেষ করে বাহির হয়েছে।০৬:০২pm -By: Rubel Ahmed
16th February 2025, 6:51pm: কাজ শেষ করে প্লান্টে প্রবেশ করেছেন।০৬:৩৪pm -By: Rubel Ahmed
17th February 2025, 11:42am: প্রদানকৃত মালামালের তালিকাঃ 01. VFD Main Control Module (VFD controller with display)= 01 Set
Brand: Schneider, Origin: France.
Items Code: 02-25-01-0003
DTW_116 -By: Md. Amzad Hossen
17th February 2025, 11:45am: প্রদানকৃত মালামালের তালিকাঃ VFD controller Serial: 641922004190 EAV75036A02, Display: WXHRB67835211870011 -By: Md. Amzad Hossen
19th February 2025, 10:39am: জমাকৃত মালামালের তালিকাঃ আসসালামু আলাইকুম ওয়ারাহমাতুল্লাহি ওয়াবারাকাতুহু,
জনাব কাজী জুয়েল VFD Main Control Module (VFD controller with display)= 01 Set টির আপডেট দিন।
-By: Md. Amzad Hossen
19th February 2025, 11:55am: পাম্পে কাজের জন্য প্লান্ট থেকে বাহির হয়েছে।11:47am -By: Rubel Ahmed
19th February 2025, 12:05pm: পাম্পে কাজের জন্য প্রবেশ করেছেন।11:56am -By: Rubel Ahmed
19th February 2025, 12:31pm: পাম্পের কাজ শেষ করে বাহির হয়েছে।12:23pm -By: Rubel Ahmed
19th February 2025, 12:37pm: কাজ শেষ করে প্লান্টে প্রবেশ করেছেন।১২:২৯pm -By: Rubel Ahmed
20th February 2025, 3:28pm: পাম্পে কাজের জন্য প্লান্ট থেকে বাহির হয়েছে।03:19pm -By: Rubel Ahmed
20th February 2025, 3:41pm: পাম্পে কাজের জন্য প্রবেশ করেছেন।03:31pm -By: Rubel Ahmed
20th February 2025, 4:27pm: সিরিয়াল কমিশন কেবল লাগানো হয়েছে -By: Kazi Jewal
20th February 2025, 4:30pm: পাম্পের কাজ শেষ করে বাহির হয়েছে।04:20pm -By: Rubel Ahmed
20th February 2025, 4:44pm: কাজ শেষ করে প্লান্টে প্রবেশ করেছেন।04:33pm -By: Rubel Ahmed
26th February 2025, 9:15am: জমাকৃত মালামালের তালিকাঃ 01. VFD Main Control Module (VFD controller with display)= 01 Set
Brand: Schneider, Origin: France.
Items Code: 02-25-01-0003
উক্ত VFD টি DTW_116 এর জন্য ইস্যু করা হয়েছে। কিন্তু DTW-208 এর জন্য ইস্যুকৃত Controllar টি পাম্প নং ১১৬ তে লাগানো হয়েছে এবং DTW_116 এর জন্য ইস্যু করা controllar টি স্টোরে জমা করা হল। -By: Md. Amzad Hossen
11th March 2025, 12:04pm: মেরামত করার জন্য স্টোরে জমা দেওয়া হল ।
সাত(৭) কর্ম দিবসের মধ্যে আমাদেরকে এই সম্পর্কিত আপডেট জানানোর জন্য অনুরোধ করা হলো ।
মেরামত সংক্রান্ত আপডেট জানানোর পর ওয়ার্ক অর্ডারটির স্ট্যাটাস পরিবর্তন করা হবে । -By: Kazi Jewal
Serial No: 106 || WID:WID1578 || Status:
Ongoing || Scheduled at: 2025-02-11
Office building 2nd floor internet switch power supply cable integration with the backup power line
Deployed Manpower:
History/Log:
24th February 2025, 10:45am: Partial work is finished (Primary power connection), For the secondary connection need three pin sockets, three plug and MK box. But the mentioned parts not available in the store. When available we finish the rest of the work -By: Field Observer
Serial No: 107 || WID:WID1577 || Status:
Ongoing || Scheduled at: 2025-02-10
DTW-104 LIT Problem. Need to check...
Deployed Manpower:
History/Log:
24th February 2025, 12:09pm: DTW-104 এ পাম্পের কাজ চলতেছে এখন এলআইটি উপরে তুলে বাস করে রাখা আছে পাম্প এর কাজ শেষ হলে আমরা এসে চেক দিব -By: Kazi Jewal
Serial No: 108 || WID:WID1576 || Status:
|| Scheduled at: 2025-02-08
DTW-208 Start/Stop problem. Need to check...
Deployed Manpower:
History/Log:
10th February 2025, 11:31pm: DTW NO 208 IN TIME 15:25 AND OUT TIME 17:12 -By: Khokon Roy17th February 2025, 11:48am: প্রদানকৃত মালামালের তালিকাঃ 01. VFD Main Control Module (VFD controller with display)= 01 Set
Brand: Schneider, Origin: Indonesia.
Items Code: 02-25-01-0003
DTW_208
VFD controller Serial: 64634061052 EAV67703, Display: FBHRB67835193560189 -By: Md. Amzad Hossen
17th February 2025, 12:08pm: প্রদানকৃত মালামালের তালিকাঃ 02. VARIABLE FREQUENCY DRIVE 55 KW= 01 Set
Brand: Schneider Electric, Origin: INDIA
Items Code: 02-25-02-0012
Serial Number: 4005400JM234100506 -By: Md. Amzad Hossen
17th February 2025, 3:45pm: ২০৮ নং পাম্পে কাজের জন্য প্লান্ট থেকে বাহির হয়েছে।০৩:৩৬pm -By: Rubel Ahmed
17th February 2025, 4:17pm: ২০৮ নং পাম্পে কাজের জন্য প্রবেশ করেছেন।০৪:০৭pm -By: Rubel Ahmed
17th February 2025, 6:33pm: New VFD install করা হয়েছে পাম একটানা ৬ থেকে ৭ দিন রান রাখতে হবে -By: Kazi Jewal
17th February 2025, 10:18pm: DTW-208 start/stop problem again... -By: Md. Khairul Momen
19th February 2025, 10:34am: জমাকৃত মালামালের তালিকাঃ জনাব কাজী জুয়েল_হেলপার আপনার দৃষ্টি আকর্ষন করছি। আপনি পাম্প নং ২০৮ এর জন্য ইস্যুকৃত VFD টি পরিবর্তন করেছেন। কিন্তু অদ্যবধি ডকুমেন্টসহ পুরাতন VFD টি স্টোরে জমা করেন নি। আমি অনুরোধ করবো ডকুমেন্টসহ VFD টি স্টোরে জমা করার জন্য।
(বি: দ্র: প্রকাশ থাকে যে, পাম্প নং ২০৮ এর জন্য একটি VFD Main Control Module (VFD controller with display)= 01 Set ইস্যু করা হয়েছে তার কোন আপডেট পাইনি।) -By: Md. Amzad Hossen
23rd February 2025, 3:48pm: New VFD install করা হয়েছে পাম একটানা পাঁচ দিন পর্যন্ত রান অবস্থায় ছিল বর্তমানে কোন সমস্যা পাওয়া যায়নি ধন্যবাদ -By: Kazi Jewal
26th February 2025, 9:13am: জমাকৃত মালামালের তালিকাঃ 01. VFD Main Control Module (VFD controller with display)= 01 Set
Brand: Schneider, Origin: Indonesia.
Items Code: 02-25-01-0003
উক্ত VFD টি DTW_208 এর জন্য ইস্যু করা হয়েছে। কিন্তু DTW-116তে লাগানো হয়েছে।
VFD controller Serial: 64634061052 EAV67703, Display: FBHRB67835193560189 -By: Md. Amzad Hossen
24th March 2025, 9:36am: জমাকৃত মালামালের তালিকাঃ Old/Damage Goods Received
01. VARIABLE FREQUENCY DRIVE 55 KW= 01 Set
Brand: Schneider Electric, Origin: INDIA
Items Code: 02-25-02-0012
Serial Number: 4005400JM170502971 -By: Md. Amzad Hossen
24th March 2025, 2:05pm: মেরামতের জন্য স্টোরে জমা দেওয়া হল আগামী ১৫ কার্য দিবসের মধ্যে তথ্য দেওয়ার জন্য অনুরোধ জানানো হলো । -By: Kazi Jewal
27th May 2025, 10:49am: Start/Stop problem. Output voltage unbalance. Output side work. -By: Kazi Jewal
27th May 2025, 11:09am: Start/Stop problem. Output voltage unbalance. Output side work. Output side IGBT with IGBT Gate card chage.Power card repair. -By: Kazi Jewal
27th May 2025, 11:45am: পাম্পে কাজের জন্য প্লান্ট থেকে বাহির হয়েছে।11:34am -By: Rubel Ahmed
27th May 2025, 11:59am: পাম্পে কাজের জন্য প্রবেশ করেছেন।11:43am -By: Rubel Ahmed
27th May 2025, 12:44pm: পাম্পের কাজ শেষ করে বাহির হয়েছে।12:32pm -By: Rubel Ahmed
27th May 2025, 3:36pm: পুরাতন একটি রিপিয়ার করা VFD চেক পারপাস লাগিয়ে দেওয়া হল এবং পুরাতন ভিএফডিটি স্টরে জুমা দেওয়ার জন্য নিয়ে যাওয়া হলো । -By: Kazi Jewal
Serial No: 109 || WID:WID1566 || Status:
Ongoing || Scheduled at: 2025-02-05
DTW-217 CCTV CAMERA CABLE TAGGING & PILLAR MARKING.
Deployed Manpower:
History/Log:
18th February 2025, 4:22pm: DTW-217 CCTV CAMERA CABLE TAGGING & PILLAR MARKING. এর কাজ করার জন্য যাচ্ছি -By: Kazi Jewal18th February 2025, 4:26pm: পাম্পে কাজের জন্য প্রবেশ করেছেন।04:16pm -By: Rubel Ahmed
24th February 2025, 12:13pm: DTW-217 তে কোন poe সুইচ বা অনু নেই যার কারণে এর কাজ করা হয়নি -By: Kazi Jewal
Serial No: 110 || WID:WID1505 || Status:
Ongoing || Scheduled at: 2025-01-29
Checking for antenna cable IRP1 and IRP2 area.
Deployed Manpower:
History/Log:
29th January 2025, 4:33pm: IRP-01 PLANT OUT TIME 15:25 -By: Khokon Roy29th January 2025, 4:35pm: IRP-01 PLANT IN TIME 16:22 -By: Khokon Roy
29th January 2025, 4:56pm: IRP-1 চেক করার কাজ সম্পন্ন হয়েছে -By: Kazi Jewal
29th January 2025, 5:10pm: DTW-102,105,109,117 লাইটিং এডেস্টার লাগানো হয়নি এবং পুরাতন কেবল খুলে আনা হয়নি -By: Kazi Jewal
Serial No: 111 || WID:WID1496 || Status:
Ongoing || Scheduled at: 2025-01-29
DTW-204 LIT problem. Need to check.
Deployed Manpower:
History/Log:
01st February 2025, 4:05pm: ২০৪ নং পাম্পে কাজের জন্য প্রবেশ করেছেন।০৩:৫৬pm -By: Rubel Ahmed01st February 2025, 4:30pm: ২০৪ নং পাম্পের কাজ শেষ করে বাহির হয়েছে।০৪:২২pm -By: Rubel Ahmed
01st February 2025, 5:16pm: LIT value not showing. LIT 00mA showing. LIT problem. -By: Humayon Kabir
04th February 2025, 4:21pm: পাম্প নাম্বার ২০৪ এ g4s এর সহযোগিতার মাধ্যমে প্রবেশ করতেছি -By: Kazi Jewal
04th February 2025, 4:22pm: ২০৪ নং পাম্পে কাজের জন্য প্রবেশ করেছেন।০৪:১৪pm -By: Rubel Ahmed
04th February 2025, 4:29pm: পাম্পে ঢুকে স্যার নিজে চেক করেছেন এছাড়া অন্য কোন কাজ করা হয়নি -By: Kazi Jewal
04th February 2025, 4:30pm: ২০৪ নং পাম্পের কাজ শেষ করে বাহির হয়েছে।০৪:২০pm -By: Rubel Ahmed
01st December 2025, 9:07am: জমাকৃত মালামালের তালিকাঃ LEVEL SENSOR WITH CABLE (LIT) = 01 Set
Brand: Holykell, Origin: China
Serial Number: 2207144008
Model: HPT604 -By: Md. Amzad Hossen
01st December 2025, 9:16am: প্রদানকৃত মালামালের তালিকাঃ LEVEL SENSOR with Cable 4-20mA = 01 Set
Brand: Holykell, Origin: China
Serial Number: 2207144015
Model: HPT604 -By: Md. Amzad Hossen
Serial No: 112 || WID:WID1494 || Status:
Ongoing || Scheduled at: 2025-01-28
DTW-203 LIT problem. Need to check.
Deployed Manpower:
History/Log:
28th January 2025, 6:52pm: এল আই টি চেক করা হয়েছে এখানে এল প্রাথমিক অবস্থায় এল আই টি সমস্যা পাওয়া গেছে -By: Kazi Jewal28th January 2025, 11:01pm: DTW NO 203 IN TIME 16:03 AND OUT TIME 17:35 -By: Khokon Roy
28th January 2025, 11:05pm: IRP-01 PLANT IN TIME 18:13 -By: Khokon Roy
Serial No: 113 || WID:WID1492 || Status:
|| Scheduled at: 2025-01-28
Serial No: 114 || WID:WID1484 || Status:
Ongoing || Scheduled at: 2025-01-26
DTW-203 start/stop problem. Need to check.
Deployed Manpower:
History/Log:
26th January 2025, 5:46pm: DTW-203 এর সাইট ভিজিট করে K5X এবং K7X রিলেতে সমস্যা পরিলক্ষিত হয়েছে। রিলে গুলোর উপরে এক ধরনের বার্নিশ জমে গেছে। তা পরিষ্কার করা হয়েছে। K5X এবং K7X রিলে LX1 এবং LX2 এর স্থানে এন্টার চেন্জ করা হয়েছে। ম্যাগনেটিক কন্টাক্টরের হালকা কার্বন পরিষ্কার করা হয়েছে। পাম্প SCADA থেকে ২০-২৫ মিনিট রান করে অবজারভেশন করা হয়েছে। কোন সমস্যা পাওয়া যায়নি। SCADA টিমকে অবজারভেশনে রাখতে বলা হয়েছে। কোন সমস্যা হলে পাম্পি বন্ধ রাখতে বলা হয়েছে। আগামীকাল নতুন রিলে লাগানো যেতে পারে। সিরিয়াল কমিউনিকেশন স্বাভাবিক দেখা গেছে। একটি PWP panel এর এডজাস্ট ফ্যানে সমস্যা পরিলক্ষিত হয়েছে। চেঞ্জ করার ব্যবস্থা নেওয়া যেতে পারে। -By: Md. Khairul Momen27th January 2025, 8:24am: আগামীকাল রিলে গুলো চেক করে কনফার্ম করে সমাধান হতে পারে। -By: SCADA OPERATION ENGR
26th February 2025, 12:02pm: প্রদানকৃত মালামালের তালিকাঃ Surge Protection Device (SPD) for power= 01 Nos.
Items Code: 02-09-15-2187 -By: Md. Amzad Hossen
26th February 2025, 12:16pm: IRP-01 PLANT OUT TIME 12:06 -By: Khokon Roy
26th February 2025, 1:24pm: DTW NO 203 IN TIME 12:41 -By: Khokon Roy
26th February 2025, 3:02pm: রিলে বেস্ট প্রবলেম সিরিয়াল কম্বিনেশন প্রবলেম লোকাল রানিং প্রবলেম রিলে ও রিলে ব্যাচ চেঞ্জ করতে হবে -By: Kazi Jewal
26th February 2025, 3:20pm: DTW NO 203 OUT TIME 14:48 -By: Khokon Roy
26th February 2025, 4:17pm: IRP-01 PLANT IN TIME 15:20 -By: Khokon Roy
11th March 2025, 12:14pm: মেরামত করার জন্য স্টোরে জমা দেওয়া হল ।
সাত(৭) কর্ম দিবসের মধ্যে আমাদেরকে এই সম্পর্কিত আপডেট জানানোর জন্য অনুরোধ করা হলো ।
মেরামত সংক্রান্ত আপডেট জানানোর পর ওয়ার্ক অর্ডারটির স্ট্যাটাস পরিবর্তন করা হবে । -By: Kazi Jewal
Serial No: 115 || WID:WID1443 || Status:
|| Scheduled at: 2025-01-08
Serial No: 116 || WID:WID1389 || Status:
|| Scheduled at: 2024-12-19
DTW-220 Automatically start/stop problem. Need to check...
Deployed Manpower:
History/Log:
Serial No: 117 || WID:WID1334 || Status:
|| Scheduled at: 2024-11-05
SCADA Operation team and MW Reporting laptop computer maintenance and Modification.
Deployed Manpower:
History/Log:
13th December 2024, 9:08am: মনিটরিং ওয়েলের ডাটা সংগ্রহের জন্য ল্যাপটপটি খুবই প্রয়োজন। গত কয়েক মাস ধরে ডাটা সংগ্রহ করা সম্ভব হচ্ছে না। তাই দ্রুত ব্যবস্থা নিয়ে প্রয়োজন। -By: Md. Khairul Momen11th January 2025, 3:58am: গত কয়েক মাস যাবত ল্যাপটপ কম্পিউটার সমস্যা থাকার দরুন ডাটা সংগ্রহ করা সম্ভব হচ্ছে না। দ্রুত সমস্যার সমাধান হলে ২০২৪ ডকুমেন্টগুলো কমপ্লিট করা যাবে । -By: Md. Khairul Momen
Serial No: 118 || WID:WID1271 || Status:
|| Scheduled at: 2024-09-23
Chlorine scale problem. Need to check ice team.
Deployed Manpower:
History/Log:
Serial No: 119 || WID:860 || Status:
|| Scheduled at: 2024-06-02
Siemens PLC simulation kit develop.
Deployed Manpower:
History/Log:
06th June 2024, 1:58pm: S7-1200, 1214dc/dc/relay cpu input power supply connection done. -By: Parves
Serial No: 120 || WID:818 || Status:
|| Scheduled at: 2024-05-26
Serial No: 121 || WID:817 || Status:
|| Scheduled at: 2024-05-23
DTW-219 Communication problem. Need to check.
Deployed Manpower:
History/Log:
20th May 2024, 3:53pm: Antenna problem found. No signal rx/tx. This dtw bridge with dtw-212. -By: Parves23rd December 2024, 6:14pm: DTW-219 Communication এর কাজ করা হয়েছে বর্তমানে স্বাভাবিক আছে -By: Kazi Jewal
Serial No: 122 || WID:814 || Status:
|| Scheduled at: 2024-05-20
DTW-206 MOV-02 Open command accept. When full open than automatically full closed. Now locally operated. Need to check.
Deployed Manpower:
History/Log:
21st May 2024, 5:06pm: DTW-206 Local pipe line MOV-2 automatic close due to DO4 & relay-k05 always remain energize. -By: Parves2024-05-29 05:42:13pm: Status changed to Solved, Because of: MOV-2 Auto closing problem solved from Program. -by: Parves
Serial No: 123 || WID:813 || Status:
|| Scheduled at: 2024-05-21
DTW-114 Communication problem and start/stop problem. Need to check.
Deployed Manpower:
History/Log:
2024-05-31 08:27:45pm: Status changed to Solved, Because of: MC problem found . MC change .Now okay. -by: Parves
Serial No: 124 || WID:808 || Status:
|| Scheduled at: 2024-05-20
DTW-106 Communication problem. All time run signal showing in SCADA. Need to check.
Deployed Manpower:
History/Log:
20th May 2024, 4:06pm: In Dtw-106 Radio communication is okay. But Always run command is active from SCADAPack. Need to check program. -By: Parves23rd December 2024, 6:19pm: DTw-106 communication এর কাজ করা হয়েছে বর্তমানে স্বাভাবিক আছে -By: Kazi Jewal
Serial No: 125 || WID:779 || Status:
|| Scheduled at: 2024-05-04
HP Laser Jet 700 M712 printer ink installation.
Deployed Manpower:
History/Log:
Serial No: 126 || WID:777 || Status:
|| Scheduled at: 2024-05-04
DTW-215 has VFD problem. Need to check emergency.
Deployed Manpower:
History/Log:
06th May 2024, 2:13pm: VFD inspection report: 1. VFD drive check- ok 2. Input Line Voltage check- ok 3. VFD status check- NLP 4. DC Bus Voltage check- Not ok The DC bus may not be powering up, which could indicate a drive issue. Suggest to measure the DC bus voltage across PA+ and PC- terminals. Expect to measure a value = line voltage x 1.414. DC bus is powered OK, then suspect a power board or control board issue. -By: Parves27th May 2025, 10:54am: NLP সমস্যার জন্য ইনপুট সাইডে কাজ করে ঠিক করা হয়েছে। Motor Short circuit সমস্যা হলে Output Side এর IGBT তে কাজ করে ঠিক করা হয়েছে। -By: Kazi Jewal
27th May 2025, 3:36pm: পুরাতন একটি রিপিয়ার করা VFD চেক পারপাস লাগিয়ে দেওয়া হল এবং পুরাতন ভিএফডিটি স্টরে জুমা দেওয়ার জন্য নিয়ে যাওয়া হলো । -By: Kazi Jewal
2024-05-14 02:47:13pm: Status changed to Solved, Because of: New VFD install at dtw-215.
Old VFD had low bus voltage issue. So NLP status came. -by: Parves
Serial No: 127 || WID:647 || Status:
|| Scheduled at: 0000-00-00
A new bullet camera install at IRP-2 front gate.
Deployed Manpower:
History/Log:
Serial No: 128 || WID:582 || Status:
|| Scheduled at: 0000-00-00
Chlorine Daily used weight (kg) would like to add.
Deployed Manpower:
History/Log:
Serial No: 129 || WID:580 || Status:
|| Scheduled at: 0000-00-00
LPN Flow summary trend would like to add. Now we can see current status and previous status.
Deployed Manpower:
History/Log:
13th December 2024, 9:05am: দৈনিক লোকাল লাইনে পানি সরবরাহের পরিমাণ সার্ভারে সংরক্ষণের জন্য এবং অপারেশন কার্যক্রমকে আরো সহজ করার জন্য দ্রুত ব্যবস্থা নেয়া প্রয়োজন। -By: Md. Khairul Momen
Serial No: 130 || WID:289 || Status:
|| Scheduled at: 0000-00-00
For good operation work purposes we need ten(10) strong and qualityful Walki-Talki. It is highly essential for operation and maintenance work. Recent Walkie-Talkie Condition are very bad and performance is worst.
Deployed Manpower:
No Manpower Deployed YetHistory/Log:
Serial No: 131 || WID:259 || Status:
|| Scheduled at: 0000-00-00
IRP2 RTU panel both the two exhaust fan is burned out. Temparature of the panel is increasing rapidly. Need to install hot air exhaust fan immediately. facilities to control the temparature . Need to install air cooler there as early as possible before any incident.
Deployed Manpower:
No Manpower Deployed YetHistory/Log:
2023-06-01 11:59:45am: Status changed to Solved, Because of: Already 2 nos Local Fan are installed. -by: Parves
Serial No: 132 || WID:255 || Status:
|| Scheduled at: 0000-00-00